Lilisity

Assisted Living

Healthpoint Hws @ 93rd

351 93rd Avenue Ne, Blaine, MN 55434 · Map
Licensed for 5 residents · HEALTHPOINT HWS @ 93RD

State license active
Is this your community? Claim this listing

Healthpoint Hws @ 93rd is a state-licensed assisted living community in Blaine, Minnesota. It is licensed for 5 residents. Lilisity publishes no score or ranking for this community; the details below come from the state licensing record.

Assisted LivingCare offered
5 residentsLicensed capacity
State licensedAssisted living facility
$2,200 to $4,800/moTypical assisted living start in Minnesota, from 74 communities that publish prices

Prices

This community does not publish its prices.

Area costs

Assisted Living in Minnesota typically starts at $2,200 to $4,800 a month. Based on 74 communities that publish prices. These are area figures, not this community's price.

Lilisity’s independent report

What the public record shows

Gathered by Lilisity from state and federal sources. Communities can’t edit this part of the page.

State inspections

1Substantiated investigations

Last evaluation: Jul 3, 2026. See the record

License

Active, 5 residents

Assisted Living Facility 425044, current license dated Apr 28, 2026. Licensee HEALTHPOINT HWS @ 93RD.

Nearest emergency room

6.4 miles

Mercy Hospital, rated 3 of 5 stars by CMS.

Side by side with nearby communities

The 4 nearest communities that offer assisted living, by straight-line distance. Prices are starting prices each community publishes; we never show estimates.

CommunityDistanceLicensed capacityPublished starting priceLicenseInspection citations
Healthpoint Hws @ 93rd this community5Not publishedActive1 substantiated
Starpath Living0.2 mi5Not publishedActiveNo record
New Bridge Care0.4 mi5Not publishedActive0 substantiated
MN Best Homecare0.7 mi4Not publishedActive0 substantiated
Butterfly Assisted Living0.8 mi5Not publishedActive0 substantiated
State inspection record1 substantiated
Last evaluation
July 3, 2026
Evaluations on record
2
Investigations substantiated
1 kept 7 years
Inconclusive
0 kept 4 years
Unsubstantiated
0 kept 3 years

Most recent evaluation (July 3, 2026, state report ZF5F11)

MDH: “On June 29, 2026 through July 1, 2026 the Minnesota Department of Health conducted a full survey at the above provider and the following correction orders are issued.”

Survey completed July 3, 2026: 24 correction orders

  • Tag 340: 144G.30 Subd. 5 Correction orders Level 2, widespread scope, scope/level letter F · correction period: Seven (7) days · fine: $500.00 assessed
    Details

    Summary: MDH found the licensee failed to have sufficient documentation with actions taken to comply with correction orders for a survey completed on April 11, 2024.

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to have sufficient documentation with actions taken to comply with correction orders for a survey completed on April 11, 2024. This had the potential to affect all residents, staff, and visitors at the facility. [...]”

    Rule cited: “(a) A correction order may be issued whenever the commissioner finds upon survey or during a complaint investigation that a facility, a managerial official, an agent of the facility, or staff of the facility is not in compliance with this chapter. [...]”

  • Tag 650: 144G.42 Subd. 8 (a) Staff records Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure employee records included all required content for two of two employees housing manager/unlicensed personnel (HM/ULP)-B and registered nurse (RN)-C.

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure employee records included all required content for two of two employees housing manager/unlicensed personnel (HM/ULP)-B and registered nurse (RN)-C. [...]”

    Rule cited: “(a) The facility must maintain current records of each paid staff member, each regularly scheduled volunteer providing services, and each individual contractor providing services. [...]”

  • Tag 660: 144G.42 Subd. 9 Tuberculosis prevention and control Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to establish and maintain a tuberculosis (TB) prevention program based on the most current guidelines issued by the Centers for Disease Control and Prevention (CDC) which included TB history and symptom screen and baseline TB screening by completion of a two-step tuberculin skin test (TST), TB blood test, or documented history of positive TB test with the required follow up chest x-ray for two of two employees (house manager/unlicensed personnel (ULP)-B and registered nurse (RN)-C).

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to establish and maintain a tuberculosis (TB) prevention program based on the most current guidelines issued by the Centers for Disease Control and Prevention (CDC) which included TB history and symptom screen and baseline TB screening by completion of a two-step tuberculin skin test (TST), TB blood test, or documented history of positive TB test with the required follow up chest x-ray for two of two employees (house manager/unlicensed [...]”

    Rule cited: “(a) The facility must establish and maintain a comprehensive tuberculosis infection control program according to the most current tuberculosis infection control guidelines issued by the United States Centers for Disease Control and Prevention (CDC), Division [...]”

  • Tag 680: 144G.42 Subd. 10 Disaster planning and emergency preparedness Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to develop a written emergency preparedness plan (EPP) with all the required content.

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to develop a written emergency preparedness plan (EPP) with all the required content. This had the potential to affect all residents, employees, and visitors to the facility. [...]”

    Rule cited: “(a) The facility must meet the following requirements: (1) have a written emergency disaster plan that contains a plan for evacuation, addresses elements of sheltering in place, identifies temporary relocation sites, and details staff assignments in the event [...]”

  • Tag 775: 144G.45 Subd. 2. (a) Fire protection and physical environment Level 3, widespread scope, scope/level letter I · correction period: Immediate · fine: $1,000.00 assessed
    Details

    Summary: MDH found the licensee failed to comply with Minnesota Fire Code, Minnesota Rules 7511.

    MDH’s finding, as written: “Based on observation and interview, the licensee failed to comply with Minnesota Fire Code, Minnesota Rules 7511. This had the potential to directly affect two residents and all staff. [...]”

    Rule cited: “Each assisted living facility must comply with the State Fire Code in Minnesota Rules, chapter 7511, and:”

Show all 24
  • Tag 780: 144G.45 Subd. 2 (a) (1) Fire protection and physical environment Level 2, pattern scope, scope/level letter E · correction period: Two (2) days
    Details

    Summary: MDH found the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G.

    MDH’s finding, as written: “Based on observation, record review, and interview, the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G. [...]”

    Rule cited: “(a) Each assisted living facility must comply with the State Fire Code in Minnesota Rules, chapter 7511, and: (1) for dwellings or sleeping units, as defined in the State Fire Code: (i) provide smoke alarms in each room used for sleeping purposes; (ii) [...]”

  • Tag 790: 144G.45 Subd. 2 (a) (2-3) Fire protection and physical environment Level 1, pattern scope, scope/level letter B · correction period: Seven (7) days
    Details

    MDH’s finding, as written: “Based on observation, record review, and interview, the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G. [...]”

    Rule cited: “(2) install and maintain portable fire extinguishers in accordance with the State Fire Code; (3) install portable fire extinguishers having a minimum 2-A:10-B:C rating within Group R-3 occupancies, as defined by the State Fire Code, located so that the travel [...]”

  • Tag 800: 144G.45 Subd. 2 (a) (4) Fire protection and physical environment Level 2, pattern scope, scope/level letter E · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G.

    MDH’s finding, as written: “Based on observation, record review, and interview, the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G. [...]”

    Rule cited: “(4) keep the physical environment, including walls, floors, ceiling, all furnishings, grounds, systems, and equipment in a continuous state of good repair and operation with regard to the health, safety, comfort, and well-being of the residents in accordance [...]”

  • Tag 810: 144G.45 Subd. 2 (b-f) Fire protection and physical environment Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days · fine: $500.00 assessed
    Details

    Summary: MDH found the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G.

    MDH’s finding, as written: “Based on observation, record review, and interview, the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G. [...]”

    Rule cited: “(b) Each assisted living facility shall develop and maintain fire safety and evacuation plans. [...]”

  • Tag 830: 144G.45 Subd. 3 Local laws apply Level 2, pattern scope, scope/level letter E · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G.

    MDH’s finding, as written: “Based on observation, record review, and interview, the licensee failed to ensure the physical environment of the facility was maintained in compliance with the requirements of Minnesota Statute 144G. [...]”

    Rule cited: “Assisted living facilities shall comply with all applicable state and local governing laws, regulations, standards, ordinances, and codes for fire safety, building, and zoning requirements, except a facility with a licensed resident capacity of six or fewer [...]”

  • Tag 910: 144G.50 Subd. 2 (a-b) Contract information Level 1, widespread scope, scope/level letter C · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to execute a written contract with the required content for one of one resident (R1).

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to execute a written contract with the required content for one of one resident (R1). This practice resulted in a level one violation (a violation that will cause only minimal impact on the residents and does not affect health or safety) and was issued at a widespread scope (when problems are pervasive or represent a systemic failure that has affected or has potential to affect a large portion or all of the residents). [...]”

    Rule cited: “(a) The contract must include in a conspicuous place and manner on the contract the legal name and the health facility identification of the facility. [...]”

  • Tag 970: 144G.50 Subd. 5 Waivers of liability prohibited Level 1, widespread scope, scope/level letter C · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure the assisted living contract did not include language waiving the facility's liability for health, safety, or personal property of a resident.

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure the assisted living contract did not include language waiving the facility's liability for health, safety, or personal property of a resident. This had the potential to affect all residents. [...]”

    Rule cited: “The contract must not include a waiver of facility liability for the health and safety or personal property of a resident. [...]”

  • Tag 1470: 144G.63 Subd. 2 Content of required orientation Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure employees received orientation to include all required content for two of two employees (housing manager/unlicensed personnel (HM/ULP)-B, and registered nurse (RN-C).

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure employees received orientation to include all required content for two of two employees (housing manager/unlicensed personnel (HM/ULP)-B, and registered nurse (RN-C). [...]”

    Rule cited: “(a) The orientation must contain the following topics: (1) an overview of this chapter; (2) an introduction and review of the facility's policies and procedures related to the provision of assisted living services by the individual staff person; (3) handling [...]”

  • Tag 1500: 144G.63 Subd. 5 Required annual training Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure employees received at least eight (8) hours of training for each 12 months of employment that included the required annual training content for two of two employees (housing manager/unlicensed personnel (HM/ULP)-B and registered nurse (RN)-C).

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure employees received at least eight (8) hours of training for each 12 months of employment that included the required annual training content for two of two employees (housing manager/unlicensed personnel (HM/ULP)-B and registered nurse (RN)-C). [...]”

    Rule cited: “(a) All staff that perform direct services must complete at least eight hours of annual training for each 12 months of employment. [...]”

  • Tag 1530: 144G.64 (a) (1-2) Training in Dementia, Mental Illness, and De- Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure all staff received eight hours of initial dementia care training within 160 working hours of employment for direct care staff as required for one of two employees (housing manager/unlicensed personnel (HM/ULP)-B).

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure all staff received eight hours of initial dementia care training within 160 working hours of employment for direct care staff as required for one of two employees (housing manager/unlicensed personnel (HM/ULP)-B). [...]”

    Rule cited: “(a) All assisted living facilities must meet the following dementia care, mental illness, and de-escalation training requirements: (1) supervisors of direct-care staff must have at least eight hours of initial training on dementia topics specified under [...]”

  • Tag 1620: 144G.70 Subd. 2 (c-e) Initial reviews, assessments, and monitoring Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
    Details

    Summary: MDH found the licensee failed to ensure the registered nurse (RN) conducted ongoing resident assessment and reassessment, not to exceed 90 calendar days from the last date of the assessment for two of two residents (R1 and R2).

    MDH’s finding, as written: “Based on observation, interview and record review, the licensee failed to ensure the registered nurse (RN) conducted ongoing resident assessment and reassessment, not to exceed 90 calendar days from the last date of the assessment for two of two residents (R1 and R2). [...]”

    Rule cited: “(a) Residents who are not receiving any assisted living services shall not be required to undergo an initial nursing assessment. [...]”

  • Tag 1650: 144G.70 Subd. 4 (f) Service plan, implementation and revisions to Level 2, widespread scope, scope/level letter F · correction period: Twenty-One (21) days
    Details

    MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to ensure the service plan included the correct required content for two of two residents (R1 and R2). [...]”

    Rule cited: “(f) The service plan must include: (1) a description of the services to be provided, the fees for services, and the frequency of each service, according to the resident's current assessment and resident preferences; (2) the identification of staff or [...]”

  • Tag 1720: 144G.71 Subd. 4 Resident refusal Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to discuss with the resident the possible consequences of the resident's medication refusal and document the discussion in the resident's record for one of one (R1) reviewed.

    MDH’s finding, as written: “Based on observation, interview and record review, the licensee failed to discuss with the resident the possible consequences of the resident's medication refusal and document the discussion in the resident's record for one of one (R1) reviewed. [...]”

    Rule cited: “The assisted living facility must document in the resident's record any refusal for an assessment for medication management by the resident. [...]”

  • Tag 1750: 144G.71 Subd. 7 Delegation of medication administration Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to ensure the registered nurse (RN) prepared in writing specific instructions for one of two residents (R1) who received medication management services.

    MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to ensure the registered nurse (RN) prepared in writing specific instructions for one of two residents (R1) who received medication management services. [...]”

    Rule cited: “When administration of medications is delegated to unlicensed personnel, the assisted living facility must ensure that the registered nurse has: (1) instructed the unlicensed personnel in the proper methods to administer the medications, and the unlicensed [...]”

  • Tag 1820: 144G.71 Subd. 13 Prescriptions Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
    Details

    Summary: MDH found the facility failed to ensure there was a current, written, or electronically recorded prescription for prescribed medications that the assisted living facility was managing for one of two residents (R1).

    MDH’s finding, as written: “Based on observation, interview and record review, the facility failed to ensure there was a current, written, or electronically recorded prescription for prescribed medications that the assisted living facility was managing for one of two residents (R1). [...]”

    Rule cited: “There must be a current written or electronically recorded prescription as defined in section 151.01, subdivision 16a, for all prescribed medications that the assisted living facility is managing for the resident.”

  • Tag 1880: 144G.71 Subd. 19 Storage of medications Level 2, widespread scope, scope/level letter F · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to ensure all medications were securely locked in substantially constructed compartments and permitted only authorized personnel to have access.

    MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to ensure all medications were securely locked in substantially constructed compartments and permitted only authorized personnel to have access. This had the potential to affect all residents. [...]”

    Rule cited: “An assisted living facility must store all prescription medications in securely locked and substantially constructed compartments according to the manufacturer's directions and permit only authorized personnel to have access.”

  • Tag 1950: 144G.72 Subd. 4 Administration of treatments and therapy Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to ensure one of two employees (housing manager/unlicensed personnel (HM/ULP-B) demonstrated competency in continuous positive airway pressure and orthotic brace to a registered nurse (RN).

    MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure one of two employees (housing manager/unlicensed personnel (HM/ULP-B) demonstrated competency in continuous positive airway pressure and orthotic brace to a registered nurse (RN). [...]”

    Rule cited: “Ordered or prescribed treatments or therapies must be administered by a nurse, physician, or other licensed health professional authorized to perform the treatment or therapy, or may be delegated or assigned to unlicensed personnel by the licensed health [...]”

  • Tag 1970: 144G.72 Subd. 6 Treatment and therapy orders Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to ensure up-to-date written or electronically recorded orders were

    MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to ensure up-to-date written or electronically recorded orders were maintained for one of two residents (R1) receiving treatments. [...]”

    Rule cited: “There must be an up-to-date written or electronically recorded order from an authorized prescriber for all treatments and therapies. [...]”

  • Tag 2320: 144G.91 Subd. 4 (b) Appropriate care and services Level 2, widespread scope, scope/level letter F · correction period: Seven (7) days
    Details

    Summary: MDH found the licensee failed to ensure the steps of the medication administration process were followed for one of one employee (unlicensed personnel (ULP)-D).

    MDH’s finding, as written: “Based on observation, interview and record review, the licensee failed to ensure the steps of the medication administration process were followed for one of one employee (unlicensed personnel (ULP)-D). [...]”

    Rule cited: “(b) Residents have the right to receive health care and other assisted living services with continuity from people who are properly trained and competent to perform their duties and in sufficient numbers to adequately provide the services agreed to in the [...]”

Fines assessed by MDH

  • Tag 340 (144g.30 Subd. 5 - Correction Orders): $500.00
  • Tag 775 (144g.45 Subd. 2. (a) - Fire Protection And Physical Environment): $1,000.00
  • Tag 810 (144g.45 Subd. 2 (b-F) - Fire Protection And Physical Environment): $500.00

Total fines assessed, as printed in the letter: $2,000.00.

Earlier evaluations (1)
  • April 11, 2024: report 9E6O11 · 12 correction orders
    Details

    Survey completed April 11, 2024: 12 correction orders

    • Tag 480: 144G.41 Subd 1 (13) (i) (B) Minimum requirements Level 2, widespread scope, scope/level letter F · correction period: Please refer to the FBEIR for any compliance dates
      Details

      Summary: MDH found the licensee failed to ensure food was prepared and served according to the Minnesota Food Code.

      MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to ensure food was prepared and served according to the Minnesota Food Code. This practice resulted in a level two violation (a violation that did not harm a resident's health or safety but had the potential to have harmed a resident's health or safety) and was issued at a widespread scope (when problems are pervasive or represent a systemic failure that has affected or has the potential to affect a large portion or all the [...]”

      Rule cited: “(13) offer to provide or make available at least the following services to residents: (B) food must be prepared and served according to the Minnesota Food Code, Minnesota Rules, chapter 4626; and”

    • Tag 510: 144G.41 Subd. 3 Infection control program Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
      Details

      Summary: MDH found the licensee failed to establish and maintain an infection control program that complies with accepted health care, medical and nursing standards for infection control.

      MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to establish and maintain an infection control program that complies with accepted health care, medical and nursing standards for infection control. The deficient practice had the potential to affect residents, employees, and visitors. [...]”

      Rule cited: “(a) All assisted living facilities must establish and maintain an infection control program that complies with accepted health care, medical, and nursing standards for infection control. [...]”

    • Tag 580: 144G.42 Subd. 2 Quality management Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
      Details

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to implement and maintain a quality management program (QMP) appropriate to the size of the facility and relevant to the type of services provided. This had the potential to affect all current residents, staff, and visitors. [...]”

      Rule cited: “The facility shall engage in quality management appropriate to the size of the facility and relevant to the type of services provided. [...]”

    • Tag 630: 144G.42 Subd. 6 (b) Compliance with requirements for reporting ma Level 2, widespread scope, scope/level letter F · correction period: Seven (7) days
      Details

      Summary: MDH found the licensee failed to develop an individual abuse prevention plan (IAPP) with the required content for one resident (R2).

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to develop an individual abuse prevention plan (IAPP) with the required content for one resident (R2). This practice resulted in a level two violation (a violation that did not harm a client's health or safety but had the potential to have harmed a client's health or safety, but was not likely to cause serious injury, impairment, or death), and was issued at a widespread scope (when problems are pervasive or represent a systemic failure [...]”

      Rule cited: “(b) The facility must develop and implement an individual abuse prevention plan for each vulnerable adult. [...]”

    • Tag 650: 144G.42 Subd. 8 Employee records Level 2, isolated scope, scope/level letter D · correction period: Twenty-One (21) days
      Details

      Summary: MDH found the licensee failed to document a completed TB baseline screening at time of hire for one of one employee (unlicensed personnel (ULP)-C.

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to document a completed TB baseline screening at time of hire for one of one employee (unlicensed personnel (ULP)-C. [...]”

      Rule cited: “(a) The facility must maintain current records of each paid employee, each regularly scheduled volunteer providing services, and each individual contractor providing services. [...]”

    Show all 12
    • Tag 660: 144G.42 Subd. 9 Tuberculosis prevention and control Level 2, widespread scope, scope/level letter F · correction period: Twenty-One (21) days
      Details

      Summary: MDH found the licensee failed to establish and maintain a tuberculosis (TB) prevention and control program based on the most current guidelines issued by the Centers for Disease Control and Prevention (CDC) when the licensee failed to complete a facility TB risk assessment.

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to establish and maintain a tuberculosis (TB) prevention and control program based on the most current guidelines issued by the Centers for Disease Control and Prevention (CDC) when the licensee failed to complete a facility TB risk assessment. [...]”

      Rule cited: “(a) The facility must establish and maintain a comprehensive tuberculosis infection control program according to the most current tuberculosis infection control guidelines issued by the United States Centers for Disease Control and Prevention (CDC), Division [...]”

    • Tag 680: 144G.42 Subd. 10 Disaster planning and emergency preparedness Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
      Details

      Summary: MDH found the licensee failed to have a written emergency preparedness plan with all the required content and failed to post an emergency preparedness plan prominently.

      MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to have a written emergency preparedness plan with all the required content and failed to post an emergency preparedness plan prominently. This had the potential to impact all residents, staff, and visitors to the facility. [...]”

      Rule cited: “(a) The facility must meet the following requirements: (1) have a written emergency disaster plan that contains a plan for evacuation, addresses elements of sheltering in place, identifies temporary relocation sites, and details staff assignments in the event [...]”

    • Tag 1370: 144G.61 Subd. 2 (a) Training and evaluation of unlicensed personn Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
      Details

      Summary: MDH found the licensee failed to ensure competencies were completed and documented for one of one employee (unlicensed personnel (ULP)-C).

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure competencies were completed and documented for one of one employee (unlicensed personnel (ULP)-C). This practice resulted in a level two violation (a violation that did not harm a resident's health or safety but had the potential to have harmed a resident's health or safety) and was issued at a widespread scope (when problems are pervasive or represent a systemic failure that has affected or has the potential to affect a large [...]”

      Rule cited: “(a) Training and competency evaluations for all unlicensed personnel must include the following: (1) documentation requirements for all services provided; (2) reports of changes in the resident's condition to the supervisor designated by the facility; (3) [...]”

    • Tag 1470: 144G.63 Subd. 2 Content of required orientation Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
      Details

      Summary: MDH found the licensee failed to ensure orientation with all the required content was completed for one of one employee (unlicensed personnel (ULP)-C).

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure orientation with all the required content was completed for one of one employee (unlicensed personnel (ULP)-C). [...]”

      Rule cited: “(a) The orientation must contain the following topics: (1) an overview of this chapter; (2) an introduction and review of the facility's policies and procedures related to the provision of assisted living services by the individual staff person; (3) handling [...]”

    • Tag 1500: 144G.63 Subd. 5 Required annual training Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
      Details

      Summary: MDH found the licensee failed to ensure an employee received at least eight hours of annual training for each 12 months of employment for one of one employee (unlicensed personnel (ULP)-C).

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure an employee received at least eight hours of annual training for each 12 months of employment for one of one employee (unlicensed personnel (ULP)-C). [...]”

      Rule cited: “(a) All staff that perform direct services must complete at least eight hours of annual training for each 12 months of employment. [...]”

    • Tag 1620: 144G.70 Subd. 2 (c-e) Initial reviews, assessments, and monitoring Level 2, widespread scope, scope/level letter F · correction period: Twenty-one (21) days
      Details

      Summary: MDH found the licensee failed to ensure the registered nurse (RN) conducted ongoing resident monitoring and

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure the registered nurse (RN) conducted ongoing resident monitoring and reassessment no more than 90 days after the previous assessment for one of one resident (R2). [...]”

      Rule cited: “(c) Resident reassessment and monitoring must be conducted no more than 14 calendar days after initiation of services. [...]”

    • Tag 1880: 144G.71 Subd. 19 Storage of medications Level 2, isolated scope, scope/level letter D · correction period: Seven (7) days
      Details

      Summary: MDH found the licensee failed to maintain a temperature log to ensure appropriate storage of refrigerated medications for one of three residents (R4).

      MDH’s finding, as written: “Based on observation, interview, and record review, the licensee failed to maintain a temperature log to ensure appropriate storage of refrigerated medications for one of three residents (R4). [...]”

      Rule cited: “An assisted living facility must store all prescription medications in securely locked and substantially constructed compartments according to the manufacturer's directions and permit only authorized personnel to have access.”

    From MDH’s letter: the letter says the facility is in substantial compliance; no immediate fines.

Substantiated investigations (state reports)

  • February 12, 2025 · report HL341735763M · MDH finding: Substantiated, facility responsibility
    Details

    Allegation, as written: “The facility neglected the resident when the facility failed to provide the resident multiple doses of clozapine, his antipsychotic medication. The resident sustained a mental health crisis and was hospitalized. Additionally, the resident received double the prescribed dose of lumateperone, an antipsychotic medication, for five days when restarting on the medication with titrated (gradual increase) dosing. [...]”

    “The Minnesota Department of Health determined neglect was substantiated.”

    “The Minnesota Department of Health determined neglect was not substantiated against the alleged perpetrator (AP).”

    “The facility was responsible for the maltreatment in regards to management of clozapine.”

    Summary: MDH looked into 2 allegations and found: neglect substantiated; neglect not substantiated (facility responsibility).

    MDH’s conclusion, as written: “The Minnesota Department of Health determined neglect was substantiated. The facility was responsible for the maltreatment in regards to management of clozapine. The facility failed to ensure the resident had the needed number of doses of clozapine (antipsychotic) to get him through his vacation with family. The facility failed to notify the resident, family, and pharmacy the resident would not be available for his scheduled blood draw, a requirement for receiving his clozapine. The resident went into a mental health crisis and required hospitalization. Additionally, the facility failed to ensure the resident received a titrated dose of lumateperone (antipsychotic) and instead administered the higher dose for five days. [...]”

    Action taken by facility: “The facility made proper notifications for each medication issue with lamotrigine and lumateperone. Facility staff monitored the resident after each medication error. Regarding the lumateperone error, the UPLs were retrained on medication administration.”

    Action taken by MDH: “The responsible party will be notified of their right to appeal the maltreatment finding. The facility was found to be in noncompliance.”

    Survey completed November 25, 2024: 3 correction orders

    • Tag 1760: 144G.71 Subd. 8 Documentation of administration of medication Level 2, isolated scope, scope/level letter D
      Details

      MDH’s finding, as written: “Base on interview and record review, the licensee failed to document medication administration accurately and documented administration when a resident was not in the facility for one of one residents (R1) reviewed. [...]”

      Rule cited: “Each medication administered by the assisted living facility staff must be documented in the resident's record. The documentation must include the signature and title of the person who administered the medication. [...]”

    • Tag 1780: 144G.71 Subd. 10 Medication management for residents who will Level 3, isolated scope, scope/level letter G · correction period: Seven (7) days
      Details

      Summary: MDH found the licensee failed to ensure medications were set up by the pharmacy or a licensed nurse, failed to provide a sufficient amount of medication doses and failed to reschedule a lab draw for a high risk medication pharmacy dispense for one of one residents (R1) for planned time away from the facility.

      MDH’s finding, as written: “Based on interview and record review, the licensee failed to ensure medications were set up by the pharmacy or a licensed nurse, failed to provide a sufficient amount of medication doses and failed to reschedule a lab draw for a high risk medication pharmacy dispense for one of one residents (R1) for planned time away from the facility. R1's packed medications failed to include enough doses of clozapine, an antipsychotic medication with high clinical monitoring, including monthly lab draws. [...]”

      Rule cited: “(a) An assisted living facility that is providing medication management services to the resident must develop and implement policies and procedures for giving accurate and current medications to residents for planned or unplanned times away from home [...]”

    • Tag 2360: 144G.91 Subd. 8 Freedom from maltreatment
      Details

      Summary: MDH found the facility failed to ensure one of one resident(s) reviewed (R1) was free from maltreatment.

      MDH’s finding, as written: “The facility failed to ensure one of one resident(s) reviewed (R1) was free from maltreatment. Findings include: The Minnesota Department of Health (MDH) issued a determination maltreatment occurred, and the facility was responsible for the maltreatment, in connection with incidents which occurred at the facility. Please refer to the public maltreatment report for details.”

      Rule cited: “Residents have the right to be free from physical, sexual, and emotional abuse; neglect; financial exploitation; and all forms of maltreatment covered under the Vulnerable Adults Act.”

What the levels and scopes mean (MDH’s words)

Level 1: “a violation that has no potential to cause more than a minimal impact on the resident and does not affect health or safety”

Level 2: “a violation that did not harm a resident's health or safety but had the potential to have harmed a resident's health or safety, but was not likely to cause serious injury, impairment, or death”

Level 3: “a violation that harmed a resident's health or safety, not including serious injury, impairment, or death, or a violation that has the potential to lead to serious injury, impairment, or death”

Isolated scope: “when one or a limited number of residents are affected or one or a limited number of staff are involved, or the situation has occurred only occasionally”

Pattern scope: “when more than a limited number of residents are affected, more than a limited number of staff are involved, or the situation has occurred repeatedly; but is not found to be pervasive”

Widespread scope: “when problems are pervasive or represent a systemic failure that has affected or has the potential to affect a large portion or all of the residents”

Summaries are ours and are marked “Summary”; quoted text is MDH’s own, shortened where marked [...]. Read the full reports at the links above or search every report on MDH’s site.

What these terms mean

MDH: “An evaluation is a process regulated by the division to ensure licensees comply with the laws, rules, and certifications for the type of care and services authorized under their license/certification.”

“An investigation may occur when the division is notified that care and services are not being provided by licensees as required by law. This may include allegations of abuse, neglect, or financial misuse.”

For maltreatment, Minnesota law defines substantiated as “a preponderance of the evidence shows that an act that meets the definition of maltreatment occurred” and inconclusive as “less than a preponderance of evidence to show that maltreatment did or did not occur” (Minn. Stat. 626.5572).

Correction orders, as MDH explains on each state form: “Tag numbers have been assigned to Minnesota State Statutes for Assisted Living Facilities.” “The letter in the left column is used for tracking purposes and reflects the scope and level issued pursuant to 144G.31 subd. 1, 2, and 3.” MDH adds that there is no requirement to submit a plan of correction for violations of Minnesota state statutes.

MDH keeps investigation results for seven years when allegations are substantiated, four years when inconclusive, and three years when unsubstantiated, so the counts cover different periods. This community is licensed for 5 residents; larger communities are evaluated and reported on more often, so read counts with size in mind. Source: Minnesota Department of Health, Health Regulation Division, data as of September 28, 2026. Always visit in person and ask the community about anything listed here.

License and ownershipActive license, licensee HEALTHPOINT HWS @ 93RD
License type
Assisted Living Facility
License number
425044
License status
Active
Current license dated
2026-04-28
Licensed capacity
5
Licensee
HEALTHPOINT HWS @ 93RD
Administrator/Authorized Agent
Gamada Butta

Source: Minnesota state licensing records (agency listing), retrieved 2026-09-09. Licensing status is a matter of public record; it is not a quality rating.

Administrator/Authorized Agent name from the Minnesota licensing record, as of Sep 9, 2026.

Paying with Medicaid and other programsHow Medicaid pays for care in Minnesota, and other programs

How Medicaid pays for care in Minnesota

  • Elderly Waiver (EW), customized living services. Minnesota's Elderly Waiver, part of Medical Assistance (Minnesota Medicaid), can pay for "customized living" services, and a provider of those services must hold an assisted living license (or meet certain exceptions). You must qualify for Medical Assistance and need a nursing-home level of care. (state page)

Ask the community whether it accepts Medicaid.

Location and nearby careNearest hospital 6.4 mi, nursing home 2.2 mi, pharmacy 0.8 mi
Nearest hospital with an emergency room
Mercy Hospital, Coon Rapids. 6.4 miles away, straight line. CMS overall hospital rating: 3 of 5 stars.
Nearest Medicare nursing home
Park River Estates Care Center, Coon Rapids. 2.2 miles away, straight line.
Nearest home health agency office
Hennepin Home Health Care Inc, Brooklyn Park. 2.9 miles away, straight line. Agencies travel to clients, so ask which ones serve this address.
Nearest pharmacy
Walgreens. 0.8 miles away, straight line. From OpenStreetMap, which does not list every pharmacy, so one may be closer.
Area
USDA classes ZIP code 55434 as metropolitan (metropolitan core).
Dialysis within 15 miles
Fmc Dialysis - North Suburban, Coon Rapids, 0.8 miles away, straight line (has a shift starting after 5 pm; CMS rating 4 of 5 stars)
Davita Central Avenue Dialysis, Blaine, 2.5 miles away, straight line (CMS rating 3 of 5 stars)
Fmc - Blaine Dialysis, Blaine, 4.3 miles away, straight line (CMS rating 4 of 5 stars)
Hospice
23 Medicare hospices tell CMS they serve ZIP code 55434.
Serenity Hospice Homes LLC, office in Brooklyn Park, 3.0 miles away, straight line
Mary T Hospice, office in Coon Rapids, 3.8 miles away, straight line
Olive Grove Hospice LLC, office in Blaine, 5.1 miles away, straight line
Nearest geriatric medicine practice
Allina Health System, Coon Rapids. 0.8 miles away, straight line. 1 geriatric medicine doctor listed there.

Distances are straight lines from the community, not driving distance. Hospitals, home health, dialysis, hospice and doctors come from CMS provider data (CMS, hospital list updated Jul 22, 2026). Star ratings are CMS’s own.

Emergency and natural hazard riskFEMA overall risk very low; outside FEMA's high-risk flood areas

Public hazard maps for this location. Ask the community about its emergency plan, its generator and where residents would go in an evacuation.

Flood zone
Outside the high and moderate risk flood areas on FEMA's flood map (Zone X, minimal flood hazard, or not studied). (FEMA flood map)
FEMA National Risk Index
Overall: very low. By hazard: inland flooding very low, wildfire very low, tornado relatively low, heat wave relatively low, earthquake very low. These are FEMA’s ratings for the census tract, compared with tracts nationwide. (FEMA, December 2025)

A flood zone describes the map at this point, not the building's elevation. In an emergency, follow the local emergency management agency.

Questions to ask on a tour10 questions picked for this community from its record

Picked for this community from its record. Ask them in person and write down the answers.

  1. The state recorded a finding in February 2025. What was it, and how was it fixed?
  2. The current license dates from 2026. Has the owner or operator changed recently?
  3. What does the base rate include, and when did rates last go up?
  4. Who is here at night? Are they awake, or asleep and on call?
  5. Who covers when the owner is sick, on vacation, or away for the day? Can we meet them?
  6. Is it one flat rate, or does it rise with care needs?
  7. Can you help someone who needs two people to move, or a mechanical lift?
  8. How many caregivers are on duty during the day and at night?
  9. What happens if care needs increase? When would someone need to move?
  10. What fees are charged at move-in?
What we checked11 public sources we searched, with dates

Every public source we searched for this community. “Nothing on record” means we found no record that matched it. A record can be missed when a name or address differs.

SourceData as ofWhat we found
Minnesota Department of Health, Health Regulation Division inspection recordsSep 28, 2026See above
U.S. Department of Labor wage and hour casesOct 15, 2026Nothing on record
OSHA workplace safety inspections since 2016Oct 15, 2026Nothing on record
FEMA flood mapSee above
USDA wildfire riskApr 15, 2026Not shown: FEMA rates wildfire risk here very low
FEMA National Risk IndexSee above
CMS hospitals, home health, dialysis, hospice and doctors; OpenStreetMap pharmaciesSee above
HUD Multifamily Properties - AssistedJul 6, 2026Nothing on record
State Veterans Homes (NASVH directory)Sep 20, 2026Nothing on record
CMS Hospice - General InformationAug 19, 2026Nothing on record
CMS Home Health Care AgenciesMay 27, 2026Nothing on record
Common questionsAnswers to 4 questions families ask
What type of care does Healthpoint Hws @ 93rd provide?

Healthpoint Hws @ 93rd is licensed by the state of Minnesota for assisted living in Blaine, Minnesota. Its licensed capacity is 5 residents.

Does Lilisity rate Healthpoint Hws @ 93rd?

No. We publish state licensing details for Healthpoint Hws @ 93rd but no score, rating, or ranking. Only communities on the Top Communities list or with a Senior Living Alliance Excellence Award, both based on phone-verified resident and family interviews, are ranked.

How much does Healthpoint Hws @ 93rd cost?

Assisted Living in Minnesota typically starts at $2,200 to $4,800 a month. Based on 74 communities that publish prices. These are area figures, not this community's price. Healthpoint Hws @ 93rd does not publish its prices.

How do I contact Healthpoint Hws @ 93rd?

Visit Healthpoint Hws @ 93rd at 351 93rd Avenue Ne, Blaine, MN 55434.

Choosing a small care homeOur care guide: what to look for, what it costs, how families pay, and more questions to ask (PDF)

Report a wrong fact

How Lilisity works. The only scores or rankings Lilisity publishes are the Top Communities list and the Excellence Awards, both built from phone-verified resident and family interviews. Communities can pay Lilisity a flat monthly fee to manage their own listing: photos, prices, contact details, and receiving the inquiries families choose to send them. The fee is the same no matter how many families contact them or move in. Senior Living Alliance, which runs Lilisity, offers the same listing to its member communities as part of their membership; members pay SLA for its resident and family interview program. No community pays Lilisity per inquiry, per referral or per move-in. Payment never changes a testimonial, a rating, or the order of search results. The "Nearby Senior Living Alliance communities" box shows member communities only. How we verify testimonials · How we are paid